At the t4 first exposure machine moved into the swearing-in meeting, more than 1,000 employees solemnly took the oath under the leadership of Zhao Yong, general manager of Wuhan Huaxing Optoelectronics Semiconductor Display Technology Co., Ltd. The impassioned pledges inspired the morale of all employees, inspired everyone's morale, and strengthened the efforts of Huaxing people to ensure the confidence and determination of the successful mass production of the t4 project.

T4 project development process:

On March 31, 2017, the signing ceremony of Wuhan Huaxing Optoelectronics 6th generation LTPS-AMOLED project was successfully held in Donghu Hotel. Huaxing Optoelectronics signed a cooperation agreement with Wuhan Donghu New Technology Development Zone Management Committee to invest 35 billion yuan in Donghu New Technology Development Zone. The Intelligent Manufacturing Industrial Park built a 6-generation LTPS-AMOLED flexible display panel production line.

On June 13, 2017, Wuhan Huaxing Optoelectronics t4 project began to piling.

On December 28, 2017, Wuhan Huaxing Optoelectronics 6th generation flexible LTPS-AMOLED display panel production line project (referred to as “t4 project”) main building and power plant completed double capping 4 months ahead of schedule, refreshing the record of construction speed of similar plants in the industry.

On the morning of July 20, 2018, the first exposure machine of the 6th generation flexible LTPS-AMOLED display panel project (t4 project) of Wuhan Huaxing Optoelectronics was moved in.

It is expected that the product will be lighted in early 2019 and trial production will begin.